Jobs Career Advice Signup
X

Send this job to a friend

X

Did you notice an error or suspect this job is scam? Tell us.

  • Posted: Sep 25, 2023
    Deadline: Not specified
    • @gmail.com
    • @yahoo.com
    • @outlook.com
  • Never pay for any CBT, test or assessment as part of any recruitment process. When in doubt, contact us

    We deliver project and asset services for the energy, chemicals and resources sectors around the world.
    Read more about this company

     

    Manager II, Construction

    About the Job

    Reporting to:                          

    • Site Construction Manager

    Description of position:         

    • Incorporates the management, co-ordination, alignment, validation, forecasting and reporting of Mining, Engineering, Procurement, Warehousing and Storage, Construction and Commissioning attributes and parametric measures of work, per system.

    Marula Phase 2 EPCM Project.

    Design Scope of Work and Footprint

    • The scope of work for the EPCM Contractor will include, project management services, engineering design and drawings, and construction management including commissioning of both surface and underground engineering infrastructure and mining development at both declines up to 2030. Note Worley involvement in this project is to December 2025
    • Worley will also manage the procurement of the Mining Development Contractor with input from the Integrated Owners Team (IMOT). The EPCM Contractor not will manage the mining contractor, however will be in an advisor capacity on mining schedule and will consult the IMOT team on the Pase 2 development.
    • The EPCM Contractor will report to the IMOT while executing the project.  While preparing for the onboarding of the EPCM Contractor, the IMOT is currently carrying out “Immediate Works” planning which includes the design of underground silos and a Dip-6 Conveyor at the Clapham decline as well as the scheduling of raise-boring activities for ventilation shafts.
    • The execution of this scope is expected to run for a period of about three years (until 2024). Hence, it is expected that once the EPCM Contractor is onboard (commencing January 2023), the design, integration, construction management, and commissioning of these systems will form part of the EPCM scope of work. Currently, mine development is underway, which will open the mine layout for the above-mentioned installations.
    • An independent Quantity Surveyor, (QS) will be appointed by the IMOT to work with the EPCM to fulfil the appropriate QS services and will report directly to the IMOT. Quantity Services will include generating BoQs, drafting contract documents, monitoring costs, assisting with the compilation of TEAR documents, evaluating and approving variation orders, evaluating and approving interim payment certificates, assisting in cost control management, and assisting in the preparation of monthly financial reports.

    EPCM Design Scope of Work Deliverable  

    • The EPCM contractor will design the infrastructure within the Off-Reef and On- Reef Contractor areas of development to the bottom of the two decline systems. The team will continue with the design of the infrastructure and the installations along strike from the respective level breakaways. 
    • The Off-Reef and On-Reef areas will be developed by the selected mining contractor to be managed by the EPCM.

    EPCM Construction Management Scope of Work  

    • The procurement, construction, and installation to be managed by the EPCM Contractor will be completed in June 2030 (Worley EPCM contract will run to December 2025, at which stage it in expected to be extended to 2030, subject to IMOT requirements. These levels signify the completion of the capital Phase II expansion and the end of the EPCM contract. The plant de-bottlenecking project planned to increase plant capacity will be executed by a separate EPCM contractor. 

    The Phase II SoW to be executed and managed by the Phase II EPCM contractor will consist of the  design, procurement and construction management of the following, 

    • Change house & lamp room extensions for both declines).
    • Surface sub-stations installations and upgrades to existing sub-stations,
    • Installation of overhead powerlines to raise bore sites for the new vent shafts for both declines.
    • Surface water pumping upgrades and new reticulation installations to the planned raise-bore sites for the new vent shafts for both declines.  
    • Raise-boring of two 5.5 metre diameter ventilation shafts.
    • Raise-boring of one 4.5 metre diameter ventilation shaft.
    • A 40 MVA transformer installation in the Eskom yard adjoining the mine, designed, procured, and installed under the Eskom Self-Build procedure.  
    • Surface permanent compressed air line upgrades.
    • Permanent compressed air line upgrades in the existing Phase 1 for both declines.
    • Installation of permanent compressed air lines in Phase II for both declines
    • A 20MW surface refrigeration plant with a 3 x ventilation fan system and bulk air cooler.
    • A 10MW surface refrigeration plant with a 2 x ventilation fan system and bulk air cooler.
    • Underground dip conveyors (1200mm width) at both declines including fire protection systems.
    • Underground strike conveyors (1050mm width) at both declines including fire protection systems.
    • Rock passes with chutes feeding onto the various dip conveyors.
    • Underground ventilation passes at both declines.
    • Underground electrical, C&I, water and pumping systems and reticulation at both declines.
    • Chairlifts at both declines.
    • Management of a mining contractor who will carry out the development mining activities at both declines including installation of the mining services and blasting of rock passes, silos and ventilation passes.  
    • Diesel and lubricant handling systems including installation of piping from the surface through the Phase I decline into Phase II workshops and mining areas at both declines.  

    Construction Managers Responsibilities
    This incorporates the planning, management, and performance reporting of:

    •  Man-hour’s
    •  Budgets
    •  Schedules
    •  Activities
    •  Interfaces
    •  Commitments
    •  Cash Flow
    •  Expenditure flows
    •  Forecasts
    •  Quality
    •  Change Management
    •  Risk Management
    •  Validation of contractor performance (schedules, cost and forecasts)
    •  Accurate monthly performance and forecast reporting (schedule, expenditure, cashflow), inclusive of variance analysis and explanation(s).

    Main Competencies required:

    • Mining shaft and underground experience. Min 5 years
    • Shaft equipping or shaft maintenance (shaft examination/repairs, bunton and guide replacement)
    • Winders, conveyances, ropes, rope attachments and sheave wheels.
    • Underground infrastructure construction/maintenance
    •  Ventilation and refrigeration plants
    •  Crushers
    •  Chairlifts
    •  Dewatering pump stations
    •  Conveyors
    •  Bulkheads
    •  Material tips (rock breakers, grisly)
    •  Substations and electrical installations and commissioning

    Construction

    • Understanding/knowledge of steel structure erections
    •  Torque settings
    •  Back markings
    •  Drawing detail
    •  Survey alignment (XYZ coordinates)
    •  Mechanical

     Assemble mechanical equipment

    • Ventilation and refrigeration plants
    • Conveyors
    • Chairlifts
    • Bulkheads
    • Pump stations
    • Crushers
    •  Mechanical drives alignment
    • Laser alignment
    • Conveyor belt alignment

    Interface

    • Understanding the interface between different engineering disciplines
    • Civil & structural
    • Mechanical
    • Electrical
    • C&I
    • Commissioning
    • Data books
    • Handover and lessons learned

    Responsibilities

    •   Understanding their role, purpose, reason, requirements, and deliverables.
    •   The planning, coordinating, alignment and achievement of package deliverables.
    •   Ensuring the development and enhancement of package (scope, schedule, budgets, cost baseline and forecasts) definition in accordance with execution and management plans.
    •   Ensuring the project manager is informed on the resources (skills/hours), information, effort, purchase orders and contracts required to execute and deliver the work to schedule and cost.
    •   The management and coordination of discipline deliverables and interfaces to execute the scope to budget and schedule.
    •   The implementation of robust “Package Management.”
    •   The managing of packages from inception to completion (cradle to grave).
    •   Ensuring accurate and up-to-date information is incorporated and communicated in system reports [ PRISMG2 and Primavera-6], inclusive of commitments and up to date estimated Final Costs.

    Attributes required for this job:

    • Verbal communications skills             
    • Accuracy and precision
    • Problem-solving skills            
    • Tenacity
    • Time management skills
    • Creativity and application
    • Engineering insight
    • Planning and organizing skills
    • Attention to detail

    Other requirements:

    • Own transport
    • Valid driver’s license
    • Medical fitness (heat tolerance)
    • Security clearance
    • Traveling to site
    • Perseverance
    • Technical acumen
    • People skills

    Minimum Qualification/education levels for this position:

    • Minimum /Civil Mechanical Engineering trade
    • Previous construction experience (EPCM)

    Required experience:

    • Qualification-related in the field or applicable discipline, or equivalent relevant experience.
    • 10+ years of relevant experience including supervisory, project management and/or technical experience.
    • 5 years mining experience within Mine shafts, & underground construction environment

    Method of Application

    Interested and qualified? Go to Worley on worleyparsons.taleo.net to apply

    Build your CV for free. Download in different templates.

  • Send your application

    View All Vacancies at Worley Back To Home

Subscribe to Job Alert

 

Join our happy subscribers

 
 
Send your application through

GmailGmail YahoomailYahoomail